Duct Air Leakage Testing Technician Exam Prep
Free practice questions

Free DALT-T Practice Questions

10 exam-style questions with answers and explanations, straight from our 1,030-question bank. Tap an answer to check yourself. When you're ready, take the scored version in the free practice test.

Start the free practice test → ★★★★★4.9/5 from 2,400+ candidates · No signup

The DALT-T exam has 40 questions and runs 2 hours 30 minutes.

These 10 free DALT-T questions are organized by exam domain, so you can see how each part of the Duct Air Leakage Testing Technician blueprint is tested. Reveal the answer and explanation under each question.

Domain 1: Math 12% of exam

Question 1

A leakage-test takeoff covers 20 ft of rectangular duct with external metal dimensions of 24 × 18 in., plus an elbow with 18 ft² of developed surface. The specified area method includes the duct and fitting walls and excludes the two temporary blank-off panels. Which surface area belongs in the leakage calculation?

Show answer & explanation

Correct answer: A - 158 ft²

Domain 2: Fluid Flow 22% of exam

Question 2

An isolated duct section is stable at the required duct-to-room static pressure of +2.00 in. w.g. The orifice meter's differential pressure is 0.50 in. w.g. The correctly configured meter's current calibration lists 0.50 in. w.g. = 85 CFM, 1.50 in. w.g. = 147 CFM, and 2.00 in. w.g. = 170 CFM. The permitted leakage at +2.00 in. w.g. is 100 CFM. Which report entry follows from these readings?

Show answer & explanation

Correct answer: C - 85 CFM; passes the leakage limit at the specified duct pressure.

Question 3

A pitot-static probe is correctly aligned in a moving exhaust-air stream. Both its total pressure and static pressure are below room pressure. With total pressure connected to HIGH and static pressure to LOW, a differential gauge indicates a positive value. This reading represents:

Show answer & explanation

Correct answer: C - Positive velocity pressure in an air stream below room pressure.

Domain 3: Project Documents 12% of exam

Question 4

A duct specification requires both SMACNA Seal Class B and Leakage Class 6. Which interpretation meets both requirements?

Show answer & explanation

Correct answer: A - Seal transverse joints and longitudinal seams; verify leakage against the CL6 allowance at the required test pressure.

Domain 4: Instrumentation 18% of exam

Question 5

Available pressure gauges have these specifications: Gauge A, 0-2.00 in. w.g., ±2% of full scale; Gauge B, 0-10.00 in. w.g., ±1% of full scale. The test pressure is 1.50 in. w.g., and the project permits an instrument error of no more than ±0.05 in. w.g. Both gauges meet the pressure and overrange ratings. Which selection meets the accuracy requirement?

Show answer & explanation

Correct answer: B - Gauge A only: its stated error limit is ±0.04 in. w.g.

Question 6

At the required +1.50 in. w.g., a leakage tester using a flow grid displays 6 L/s. The grid's calibrated range is 10-200 L/s; an approved low-flow nozzle covers 1-13 L/s. The allowable leakage is 9 L/s. Pressure tubing and test connections check out. What should happen before a compliance result is recorded?

Show answer & explanation

Correct answer: B - Retest at the required pressure with the low-flow nozzle and its matching instrument setting.

Domain 5: Preliminary DALT Procedures 9% of exam

Question 7

A +3.0 in. w.g. test is scheduled for duct rated at +4.0 in. w.g. The system's air-handling unit is rated at +2.0 in. w.g., but the test scope excludes it: the duct has been physically disconnected from the unit and closed with a suitably secured blank rated for the +3.0 in. w.g. test. The remaining preparation checks are complete. Select the appropriate test plan.

Show answer & explanation

Correct answer: B - Test the isolated duct at +3.0 in. w.g. and record the air handler's exclusion.

Domain 6: Specific Air Systems Procedures 15% of exam

Question 8

During a cold-deck duct-only test in an existing building, pressure also rises in the untested hot deck. The air handler has been disconnected and both deck stubs blanked. The ceiling plenum remains at room pressure, and an independent gauge confirms the hot-deck reading. Dual-duct mixing terminals are still connected, with both inlet dampers commanded shut. Which explanation best fits these findings?

Show answer & explanation

Correct answer: C - Air is crossing the closed terminal dampers into the hot deck.

Question 9

A pressure-independent VAV terminal is being returned to service after testing. Its manufacturer's data require at least 0.30 in. w.g. across the terminal to deliver the selected 500-CFM setpoint. Only 0.16 in. w.g. is available. An independent airflow measurement confirms a steady 360 CFM, and inspection confirms that the control damper is fully open. What best accounts for the unmet setpoint?

Show answer & explanation

Correct answer: D - Available differential pressure is too low to deliver the setpoint with the damper fully open.

Domain 7: Considerations for DALT 12% of exam

Question 10

As a rectangular duct is pressurized, one edge of a temporary blank lifts and a fastening screw starts pulling through the sheet metal. A coworker moves toward the blank to tighten it. What is the technician's immediate priority?

Show answer & explanation

Correct answer: A - Keep people clear; stop the blower and depressurize before repair.

That's 10 of 1,030

The full bank has 1,020 more DALT-T questions with explanations.

Continue in the free practice test →

View plans